Case Studies
Real deployments. Measurable outcomes. Each case study walks through the challenge, the SmartBatt configuration, and the results.
Bappa's Visarjan, Powered Clean — Chembur
Eliminated the dedicated diesel generator truck from an 11-hour Ganesh visarjan procession across 15 km of Mumbai streets. Two SmartBatt units on two trucks, no inter-truck cables, no fumes.
~60% cost saving · 221 kg CO₂ avoided · 11-hour runtime
Read full case study →24×7 Power for a JNPA Warehouse Site — Navi Mumbai
Replaced a 62 KVA DG with a 30 KVA DG + SmartBatt BESS on a live construction site. Overnight security restored, peak shaving through the day, ~20% lower monthly energy cost.
24×7 power · ~20% cost saving · 3.5 T CO₂ avoided over 6 months
Read full case study →Silent Power on Wheels — Blossom Food Truck, Mumbai
Replaced a 10 KVA diesel generator and lead-acid UPS entirely with a single SmartBatt Ezee unit. Zero noise, zero fumes at the service counter — and 50% lower monthly energy cost.
50% cost saving · ~660 L diesel avoided/month · 0 breakdowns in 2 months
Read full case study →Zero Diesel at 1,200 Feet — St. Regis Mumbai, 38th Floor
Powered a full professional audio rig — DiGiCo console, line array stacks, amplifier racks — for an 18-hour private event at St. Regis Mumbai. No generator cables, no on-site staffing through the night.
40% cost saving · 627 kg CO₂ avoided · 0 on-site staff at event
Read full case study →More coming across every segment
Weddings & Social Events
Case study in preparation
Stage Shows & Concerts
Case study in preparation
Disaster Relief & Humanitarian
Case study in preparation
Commercial Real Estate
Case study in preparation
Industrial Backup
Case study in preparation
Remote & Off-Grid Sites
Case study in preparation
Want to be a case study?
If you've run a deployment with SmartBatt and would like to share your story, get in touch with us.
Get in Touch